bayneshoffman4439 bayneshoffman4439
  • 04-04-2018
  • Business
contestada

The initial assessment of feasibility is made in theâ ________ phase of the systems development life cycle.

a. requirements analysis

b. component design

c. system maintenance

d. implementation

e. system definition

Respuesta :

fireflies854 fireflies854
  • 04-04-2018
a or d hope this helps
Answer Link

Otras preguntas

-7 over -10 simplified
Most Native Americans in Texas: a. became ranchers b. refused to accept mission life c. adapted easily to Spanish culture d. wanted to learn a trade
In desperate need of help with long division with variables and exponents!!!
Are GMO's Genetically modified organisms in plants?
What animal can not walk backwards A. Kangaroo B.Cat C.Dog D.Cheetah
Someone came into my shop and stole $100 out of the register without my knowledge. The person came with the same $100 5 minutes later and he bought $70 in Items
List the advantages the british had at the beginning of the revolutionary war.
2 and 1 fourths tons us how many pounds?
How can rivers provide resources?
What is the slope-intercept form equation of the line that passes through (3, 4) and (5, 16)?