Tammy1111 Tammy1111
  • 04-01-2016
  • Mathematics
contestada

a construction crew just finished building a road the crew worked for 4 1/3 days. if they built 2 1/7 kilometers of road each day what is the total length of road they built

Respuesta :

Billymkhoi
Billymkhoi Billymkhoi
  • 04-01-2016
4 1/3 days* (2 1/7 km of road/ 1 day)= 9.285714286... km of road.

The total length of the road they built is 9.286 km.

Hope this helps~
Answer Link

Otras preguntas

Pathology in a sentence
Who led most of the Italian Renaissance city-states? a. doges b. artists and architects c. monarchs d. powerful merchant families
What might happen to a population of rabbits in a forest if a new predator moved to the forest?
The best way to locate a suffix is to look for a word part that _________
Neptune is 4498252900 kilometers from the sun whitch distance is 200000000 killometers closer to the sun
5n+9=2n solve equation
induction of 9,3,1,1/3,1/9, what are nrxt three numbers
What property describes the number sentence 6+0=6
To the nearest thousand , the population of Texas was estimated to be 24,327,000 in 2008 . describe the actual population that Texas could have had in 2008 .
in the Spanish-speaking world which of the following is a culturally important practice that takes place after meal