ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

Create a short paragraph (minimum 8 lines), describing a city or a country around the world, except Colombia. use the adverbs of quantity to talk about negative
Solve the following inequality: 9x+2/3(−7x+6)−1≥2
What were the consequences for people involved in the 9/11 attack?
solve for the equation 6x+14=7x+8
In their written works, both Benjamin Franklin and Thomas Paine __________. Question 6 options: A. demonstrate the ability of humans to improve themselves and s
Where do I plot 1.25 and -1.25
Ariana has atoy car collection. She keeps 14 of the toy cars on her wall, which is 35% of her entire collection. What is the total number of toy cars in Ariana'
5^x + 5^x+1= 150 Find x Help me pls i need soon Tksss
Flammable materials, like alcohol, should never be dispensed or used near Group of answer choices an open door. a sink. another student. an open flame.
Express 7.4 x 10² in standard form.MATH​