brimccauley6658 brimccauley6658
  • 03-08-2022
  • Business
contestada

In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

Ms. Cox assigned a five-page English essay to her class, and one student sat in the back looking completely dreadful. "I don't care about this dumb assignment.
how do steroids affect the body
Mark the statement if it correctly describes an effect of the plague on Europe.   A. Feudalism remained strong after the plague ended. B. Scholars took an
To convert degrees Celsius to degrees Fahrenheit, use the formula F=9/5c +32. what is the temperature in °F if the temperature is 10 °C?
A child's fear at the sight of a hypodermic needle is a(n):
John is preparing for a presentation in math class. Each day 2 of 8 students will present. John is not ready the first day and does not want to present. The tea
How did Chinese farmers react to the changes made during the Sui and Tang dynasties
George made the box plots to compare the number of calories between his morning snacks and his afternoon snacks. Select from the drop-down menu to correctly com
WHAT IS THE ANSWER FOR 6/7-5/9
How to get the function of a straight line