A construction company is digging a hole for a swimming pool the whole will be 12 yards long 7 yards wide and 3 yards deep how many cubic yards of dirt will the company need to remove

Respuesta :

euqinimod
euqinimod euqinimod
  • 02-02-2017
12 * 7 * 3 = 252

the company will need to remove 252 cubic yards of dirt.
Answer Link
princess2321
princess2321 princess2321
  • 02-02-2017
It will be 252 cubic yards of dirt that the company will need to remove
Answer Link

Otras preguntas

which would most interest walt whitman? a. free speech b. hard work c. nature's beauty d. equal rights
which electromagnetic wave has the lowest frequencies (less than 3×109 hertz)?
what is 670.1 million km in scientific notation
why is hyperbole useful in poetry
Please help ASAP need as much help possible.
which religions have historically struggled for control of the middle east
order these numbers from least to greatest. −3.12 , −3.2 , 8 , −5216
which of the following is considered a drawback to using wind energy as a source of power? wind energy is highly polluting. wind energy is nonrenewable. winds d
Who assassinated President John F. Kennedy? Jack Ruby Lee Harvey Oswald Yuri Gagarin Alan Shepard
a fraction reduces to 36 if its denominator is 6x^5, what is its numerator?