helpmeplsimbeggin helpmeplsimbeggin
  • 16-02-2022
  • Business
contestada

Why Projects that arise as a result of problems and directives must be resolved quickly to avoid hurting an organization’s business?

Respuesta :

nishantnagde95
nishantnagde95 nishantnagde95
  • 16-02-2022

Answer:

Projects that arise as a result of problems and directives must be resolved quickly to avoid hurting an organization's business. The organization should complete low-priority projects before high-priority ones, if the low-priority ones take less time.

Answer Link

Otras preguntas

based on the electron configuration of the two atoms predict the ratio of metal cationic (+) atom to nonmetal anionic (-) atom in the compound. hydrogen and flu
The table below shows part of the operating budget of a small dairy farm for last year. The only expense not listed in the table is maintenance. Food = 1/3 hous
samundra deposits rs 850 at NBL at the half yearly rate of 8% for 1 year. how much interest will he get?
What is 7/15+13/19+5/12 expressed as a fraction in lower terms
What parts of China are most densely populated
Write an equation in standard form of an ellipse that has a vertex at (0, 6), a co-vertex at (1, 0), and a center at the origin.
If a train going 60 m/s hits the brakes, and it takes the train 85 seconds to stop, what is the train's acceleration?
Help for french. Attach picture.
Say 4 things that you would do if you had one hour of free time. Use 2 regular and 2 irregular verbs.
Sandy is designing a circular garden as shown in this image. Her plan is to fill the rectangular region with hyacinths. She will need 78 square feet of space pe