15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

How do u solve ratios
how many thousands are in 50000
How do historians and learn about people who lived in the earliest historical eras.
A decimal that is equivalent to 5.300
Suppose the leftmost digits of two numbers are 8 and 3 . Can you tell which number is greater? Explain.
What's the anewer to this problem..? 21×__=9×21 tell which property you used 21×=9×21 Property of multiplication..
How to multiply uneven fraction
a carpenter who is installing cabinets uses thin pieces of material called shims to fill gaps. the carpenter uses four shims to fill a gap that is 1.2 centimete
water stations will be placed every 600 meters of a fifteen kilometer race. how many water stations will be needed?
a number greater than 40 whose prime factorization contain 3 prime numbers that do not repeat