A costing system that uses actual costs for direct materials and labor and predetermined overhead rates to apply overhead is called a(n)

Respuesta :

topeadeniran2 topeadeniran2
  • 07-07-2021

Answer: normal costing system

Explanation:

A costing system which uses the actual costs for direct materials and the labor and predetermined overhead rates to apply overhead is referred to as the normal costing system.

Normal costing system is the cost allocation method whereby cost is assigned to products which are based on the labor, materials, and the overhead which are used in their production.

Answer Link

Otras preguntas

CONGRATULATIONS! You have earned $200walking dogs for your neighbors. You decide togo to Game Stop to buy several games for theNintendo Switch at $35 each.After
What is the difference between interpreting and analyzing
A computer is normally $550 but is discounted to $385. What percent of the original price does Mark pay? A. 16.5% B. 30% C. 65% D. 70%
what is main theme!??! HELP
How did the Spaniards describe Cabeza and his three friends to the Indians
didnt even spell it right dumb
How do I do this question?
Drawing was important in early history because _______________ a. it was the only recognized form of art by government and educational institutes. b. it was the
why blue intensity of copper(2)sulphate will decrease in a voltaic cell with zinc electrode in zinc sulphate solution and copper 2sulphate solution with copper
Write a Java program to accept an item's name and price from the user and output them to the console