jmystree jmystree
  • 01-07-2021
  • Business
contestada

Which is a risk in IS development?

Respuesta :

priya151255
priya151255 priya151255
  • 01-07-2021

Answer:

Very simply, a risk is a potential problem. It's an activity or event that may compromise the success of a software development project. Risk is the possibility of suffering loss, and total risk exposure to a specific project will account for both the probability and the size of the potential loss.

Answer Link
JAMESQTZY4EVERBOPOLS JAMESQTZY4EVERBOPOLS
  • 01-07-2021

ALAM BA YAN NG MAMA MO PURO KA BRAINLY TANGINAAAA MOOOO GAGOO KA!!!

Answer Link

Otras preguntas

Which aspect of the new deal angered conservatives?
what is the area of a semicircle with a diameter of 40
The four main allies in world war 1 were
Choose the equation and the inequality needed to answer this question. Trevor tutors French for $15 and hour and scoops ice cream for $10 an hour. He is going t
What have scientists learned about the way that the brain develops in children? Describe how this development happens.
What is the rate of change and initial value for the linear relation that includes the points shown in the table? x y 1 10 2 8 3 6 4 4 Initial value: 12, rate
On the galapagos islands, Darwin studied many creatures, including finches. Explain what he observed and how it relates to nature selection.
Which number is irrational? A. 75 B. 5√ C. 7.356 D. -3
Solve using elimination. 4. 2x + 3y = 12 2x – y = 4 5. 5x – 2y = - 19 2x + 3y = 0
The length of time it takes for a fetus to fully develop?