10freakygirls
10freakygirls 10freakygirls
  • 04-05-2021
  • Computers and Technology
contestada

Based on the information in the table, which of the following tasks is likely to take the longest amount of time when scaled up for a very large company of approximately 100,000 customers

Based on the information in the table which of the following tasks is likely to take the longest amount of time when scaled up for a very large company of appro class=

Respuesta :

rodeomom0306 rodeomom0306
  • 04-05-2021

Answer:

Task A

Explanation:

Answer Link

Otras preguntas

(X+12) 2 ÷ x2-144 ×-12. 12×-144
The process by which rocks are broken down into smaller fragments by the atmosphere and other factors in the environment is called?
Which word is an interjection commonly used in advertising?
The plans for a shed call for a rectangular floor with a perimeter of 204 ft. The length is two times the width. Find the length and width.
The entire region of Northern Africa and southwest Asia has a climate generally described as?
Buck drove 220 miles in 5 hours. What was his average rate of speed?
How many eighths are there in 4 1/4
The chickens on a certain farm consumed 600 pounds of feed in half a year. During that time the total number of eggs laid was 5,000. If the feed cost $1.25 per
Please tell me five slogans on conservation of natural vegetation.
The Indus, Ganges, and Brahmaputra were important to ancient India because they were