  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

3. Is the number of total molecules on the left side of a balanced equation always equal to the number of total molecules on the right side of the equation? Exp
What did nations do to increase the size of their armies? They forced prisoners into their armies. They created conscription programs. They allowed women into t
Is used by Great Britain and the US direct or Indirect
Elisha wants to draw a triangle. She starts by drawing a line 15 centimeters long and two angles, 80° and 55°. What will the third angle measure? A) 45° B) 5
what is the caribbean sea
As a teacher kris has begun providing lessons to students that teach emotional understanding respect and caring for others strategies for regulating emotion and
What is 0.5 in as hundredths in fraction form
Egon can't pay attention in class. He is easily distracted, won't sit still, and displays poor impulse control. The school counselor suggested that his parents
What is the volume of a triangular pyramid that is 4ft tall and has a base area of 3 square ft?
7 +(3 x ( 3 + 5)?) + 5