When looking at a program board at the end of program increment (PI) planning, what does it mean when a feature is placed in a team's swim lane with no strings

Respuesta :

IfeanyiEze8899 IfeanyiEze8899
  • 04-01-2021

Answer:

It simply means that other teams can independently complete the feature.

Explanation:

PI or program increment is a planning interval during which an agile release train (ART) plans and produces working and tested software and systems. It takes a duration of 8 to 12 weeks

Agile teams can access and independently complete various ARTs found in their swim lanes with no strings.

Answer Link

Otras preguntas

Will humans ever walk on the sun?
I need help with this question.
a newly planted tree needs to be stacked with wires. each wire is attached to the trunk 3 feet above the ground, and then anchored to the ground 4 feet from the
What is the best 3 options
which characteristic do all minerals have in common?
It may be cold up North, but down in the Gulf they are fishing—scudding among the Florida Keys in a little white sailboat, landing for lunch on a strand as snow
Jim works mowing lawns and babysitting. He earns $9.40 an hour for mowing and $7.70 an hour for babysitting. How much will he earn for 1 hour of mowing and 4 ho
Match each point of view with the benefit it has in telling a story,first personIt gives a personal feeling as thenarrator shares his or her thoughts.third pers
Can anyone help me find the (?,?) coordinates? The given shape is a parallelogram.
-3=1/2(4d-12) what is d? And what are the steps