lydiaj01 lydiaj01
  • 03-11-2020
  • Mathematics
contestada

QIt takes 21 minutes for 7 people to paint 7 walls

Respuesta :

2013823 2013823
  • 03-11-2020

Answer:

21 minutes divided by 7 walls = 3 minutes per wall for 5 people

Step-by-step explanation:

Assuming each worker has the same exact productivity, one person would take 15 minutes to paint a single wall (3 minutes x 5 people to get the amount of time for 1 worker per wall).

Answer Link

Otras preguntas

What commonly happens when the baby is in distress, too large, or not head down? A. Vaginal delivery with epidural B. Caesarean section C. Vaginal with forceps
An overstatement of ending inventory in one period results in.
While the Boxer rebellion failed, which of the following could be considered a positive result? Question 10 options: A nationalistic movement began to spread t
what is a central idea ?
In meiosis, how does prophase i differ from prophase ii?.
what is (2ab-a+2) - (-ab-2)
Can someone give me a French paragraph for 1B?
The world’s largest producer of corn is __________. A. Brazil B. China C. Russia D. the USA
The table shows the time it takes jessica to make rubber band bracelets using a loom. Based on the table how many bracelets can jessica make in 4.5 hours
Which of the following is an E-I stem-changing verb?