seppy36
seppy36 seppy36
  • 13-05-2020
  • Mathematics
contestada

A construction company can remove 934 metric tons of dirt from a construction site in 412 hours.
What is the unit rate in metric tons per hour?

Write your answer as a fraction or a mixed number in simplest form.

Respuesta :

aksh2007
aksh2007 aksh2007
  • 14-05-2020

Answer:

2.27

Step-by-step explanation:

Answer Link

Otras preguntas

interview three people that speak another language (besides English) at home, at work, or with his or her friends. At least one of the people you interview shou
is brainly good for my kids
the ophthalmic preparation that is not available over the counter is
What is 0.85714286 round to the nearest hundred
NEED HELP ASAP!! define mummification in own words
Which equation has a value less than 2,175? a 1 x 2,175 = ________ b 2 x 2,175 = ________ c two halves x 2,175 = ________ d one half x 2,175 = ________
is brainly good for my kids
Tien reads for 45 minutes each night before going to bed. Which expression will calculate her total reading time (in minutes) in 3 nights?
How much is 30 ones and 60 tens
As a result of their closeness to the Pacific Ocean and the Columbia River, what was important to the tribes in the region? Check all of the boxes that apply. A