The project management plan can be composed of one or more of the __________ subsidiary plans a. Cost management b. Schedule management plan c. Project scope management plan d. All of the above

Respuesta :

lilmoma0311p4iph8
lilmoma0311p4iph8 lilmoma0311p4iph8
  • 03-03-2020

Answer:

cost management or schedule management plan

Answer Link

Otras preguntas

Is the square root of any positive number irrational
What is.the reminder of 6 divided 75
Write an equation about having 6 puzzles, getting 5 more and having a lot now.
Dana plans to swim to achieve fitness. She claims that because you stretch during swimming, there is no need to cool down. How would you respond?
When and where did the constitutional convention take place?
Which is a FALSE statement about prescription medicines? A. You should stop taking the medicine when you feel better. B. You should not use medicineafter it h
(85 POINTS!) A nerve signal is like a wave. How does this work? A: An electrical wave moves down the axon by electrons moving from the place the signal starte
Explain two ways that a body covering can help an animal meet its basic needs
the average weather over a period of time
how to do twice of p minus q