​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

what does it mean to make connections when comparing and contrasting? you should look for hidden similarities and differences you should look for the most obvio
An economic incentive is best described as something that
The coefficient of the product of (-5xy^2) and (-4x^2y) is
What did it mean when the Dutch “kowtowed” to the Chinese emperor or his representatives?
discuss how stereotyping,attribution,self- fulfilling,propehcy, halo,false-consensus, primacy, and recency effect influence the perceptual process
$850 at 10% per annum for 4 years
A student standing on the ground next to a tall building throws a ball straight up with a speed of 39.2 m/s. If it takes the ball 4 seconds to reach the same he
Which vascular tissue is involved in the transport of starch found in fruit pulp?
Compare the graphs of the inverse variations. Please provide at least 3 comparisons y= -.02/x y=-.03/x Help!
The exact boundaries, limitations, and meaning of species is now known and agreed upon universally