lillymcginn lillymcginn
  • 02-11-2019
  • Mathematics
contestada

A lift that weighs 300N moves a man with a weight of 950N upwards by 12m. How much work is done to move the lift this height?

Respuesta :

skyluke89
skyluke89 skyluke89
  • 07-11-2019

Answer:

15,000 J

Step-by-step explanation:

Since the lift also carries the man, the total weight of the man+lift system is

[tex]F=300 N + 950 N = 1250 N[/tex]

The work done in moving the lift upward is

[tex]W=Fd[/tex]

where

F is the weight of the lift+man combined system

d is the displacement

In this problem,

F = 1250 N

d = 12 m

Substituting,

[tex]W=(1250)(12)=15,000 J[/tex]

Answer Link

Otras preguntas

PLEASE HELP!!!! WILL GIVE BRAINLIEST!! Let f(x)=2x and g(x)=[tex]2^{x}[/tex] Graph the functions on the same coordinate plane. What are the solutions to the eq
What is the conversion factor between kg/m^3 and g/m^3. Express your experimental values for the densities in kg/m^3.
Write the pair of fractions as a pair of fractions with a common denominator
What shapes are not 3D
Solve the following simultaneous equation by using an algebraic method (either substitution or elimination) 2x + 3y=-4 4x-y=11
What is the Role of fadh2 in cellular respiration
a family has five members. a mom, a dad, two sisters, & a brother. the family lines up single file. what is the probabillity that the mom is at the front of
I need help with this question!! Show steps please
select the sentence that that uses the correct form of the verb ver
What does Lennie's dream remind Crooks of in Of Mice and Men