infernicalminecraft infernicalminecraft
  • 01-11-2019
  • Mathematics
contestada

To complete a job a crew of 8 people needs 18 days. How long will the same job be finished if the crew will have 9 people?

Respuesta :

rockyrules789 rockyrules789
  • 01-11-2019

Answer:

16

Step-by-step explanation:

.

Answer Link
lajfoaofje lajfoaofje
  • 27-06-2020

Answer:

16

Step-by-step explanation:

Answer Link

Otras preguntas

Un frasco de perfume tiene la capacidad de 1/20 de litro. ¿Cuántos frascos de perfume se pueden llenar con el contenido de una botella de 3/4 de litro?
reily adds 45.3 and 3.21.should his sum be greater than or less than 48?Tell how you know.
What is 9 3/8 as a decimal?
what is the percentage of 15 out of 75
The evolution of populations due to chance is A)genetic drift. B)has more effect in large populations than in small populations. C)gene flow. D)natural selectio
What property is shown in the equation below? -43 / (-1)=43 A) reciprocal property B) negative one property of division C) identity property of division D) Div
How does the brain control the endocrine system?
Quartz, gold and calcite are examples
ALLIE WANTS TO ARRANGE HER FLOWER GARDEN IN 8 EQUAL ROWS. SHE BUYS 60 PLANTS. WHAT IS THE GREATEST NUMBER OF PLANTS SHE CAN PUT IN EACH ROW
It looks like the choir director is more interested in her than me.