4. Explain the purpose of a change control process. Who should be on the committee and often should it meet?

Respuesta :

Manetho
Manetho Manetho
  • 02-10-2019

Answer:

Explained

Explanation:

Change control process has a purpose to ensure that the changes are made within a project in a consisted manner and the appropriate stake holders are informed about the state of the product, changes to it and the cost and the schedule impact of these changes. The change control board in a software company often consists of the development manager, the test lead and the product manager( Subject matter expert).

Answer Link

Otras preguntas

Answer each question about the following arithmetic series: 12 + 18 + 24 + 30 + . . . + 198 What is the value of the arithmetic series? 630 1,260 3,360 6,336
what is the meaning of carbon​
Click Listen to a Single Source and select Audio enabled on the right control panel, Now place the listener at different distances from the speaker What do you
PLS TRY TO ANSWER IN THE NEXT TWO DAYS I HAVE A PAPER TO TURN IN What are dynamics in music?
the lengths of two sides of a triangle are 2x-5 and x+3. If the perimeter of the triangle is 4x-1, what is the length of the third side in terms of x?
What does a person hope to gain from this pilgrimage?
there are 40 students waiting in the line to enter the museum. There are 4 times as many students in the museum as are in line waiting. How many students are in
find the matrix b from the question.
solve all for brainiest
Can u help me on this plzz