carl105
carl105 carl105
  • 04-04-2016
  • Mathematics
contestada

what is In 7 days, a group of workers can plant 21 acres. What is their rate in acres per day?

Respuesta :

kelpel197
kelpel197 kelpel197
  • 04-04-2016
So do 21/7 to give you how much they do in a day. The answer is three so they do 3 aceres in a day.
Answer Link

Otras preguntas

Which process is exothermic? (1) boiling of water (2) melting of copper (3) condensation of ethanol vapor (4) sublimation of iodine
What are the 6 characteristics or bonds that create a nation-state
what is the value of x for the graph 4x-5y=40
Which substance can not be broken down by a chemical change? (1) methane (3) tungsten (2) propanal (4) water
a circular mirror has a diameter o 12 inches. what is the area , in square inches , of the mirror
What is the gram-formula mass of (NH4)3PO4?(1) 112g/mol (2) 121g/mol (3) 149g/mol (4) 242g/mol
What is 8.83 rounded to?
what are the zeros of (x-2)(x^2-9)
An 89 ῼ resistor has a current of 65 mA flowing through it. What is the voltage in the resistor?
what was the religion that stressed the role of the master of japan I need it for today plz