a contractor estimates that he can paint a house in 5 days using 6 men. if he actually uses 5 men for the job, how many days will they take to paint the house?

Respuesta :

Einstein08 Einstein08
  • 01-09-2018
it will take 4 days to paint the house with 5 men
Answer Link
tramserran
tramserran tramserran
  • 01-09-2018

1 house = 6 men x 5 days  = 30 man days

Need 30 man days with only 5 men: 30x = 5 men   →  x = 6

It will take 6 days for 5 men to complete the job.

Answer: 6 days


Answer Link

Otras preguntas

what is (-5/8)×(2/3)​
One direct result of the persian gulf war/operation desert storm was that the united states
50.Belinda has 10 cups of flour. She uses 3 cups of it to make a loaf of bread.She uses 1/4 cup of the remaining flour for each biscuit she wants to make. Howma
How did the multiplex telegraph change communication in the 1800s? It helped trains run on schedule and avoid collisions. It made it possible to use Morse code
convert 6.35 grams of aluminum sulfate to moles​
What are the solutions to the system of equations? x = x^2 - 4x +3 y = -x +3
The rate of a chemical reaction will be affected more by which? entropy enthalpy both enthalpy and entropy neither enthalpy nor entropy
20 Which of the following traffic signals tell the motorist that travel in the lane the signal is over is prohibited? 0 0 0 a) b) c) d) Red X Green X Yellow X A
What did the railroad strike of 1877 and the homestead strike of 1892 have in common?
What is the slope of ( -6,2) and (2,2) Also slope of (-8,9) and(-8,-5)